Gornitzky represented U. Dori in the company’s NIS 50 million suit against the EPC contractor of the Dorad power station, Wood Group and its subsidiary. The Dorad power station is a combined cycle power station based on natural gas. It is the largest independent power station in the country and will generate up to a total of 840 megawatts of electricity, which will be sold to the IEC and to large industrial/institutional customers through the IEC’s distribution grid.
U. Dori Engineering Works Corp. Ltd. was represented by Eli Cohen (Partner) and Or Lustgarten.